SP3 Platform

37

Ferndale Earthquake Reconnaissance & Webinar

Designing for functional recovery does not mean designing for no damage, but rather designing to prevent damage that prevents the building from being occupiable and functional. Our analytical methods for estimating functional recovery times (mentioned in the earlier article in this newsletter) depend heavily on...

37

5th International Workshop on SPONSE

SP3 Senior Research Engineer, Dave Welch, Ph.D., was invited by the Applied Technology Council (ATC) to serve on the scientific committee to be a part of the review process and development of the workshop proceedings.
The Fifth International Workshop on Seismic Performance of Non-Structural Elements (5SPONSE)...

37

2022 NCSEA Summit

SP3 Sr. Associate, Aaron Malatesta, presents on applications for seismic risk assessment, methodologies and recent SP3 comparison study results of other available methods at the 2022 NCSEA conference in Chicago, IL. This presentation aligned with the conference’s focus on the importance of the practical application...

37

New International Sites in SP3-RiskModel

The SP3-RiskModel has now been extended to work seamlessly for international sites, leveraging the modeling automations previously only available for sites in the United States. Please see our SP3 Knowledge Base article for more of the technical details!...

37

2022 SEAOC Convention

The SP3 Team participated in the 2022 Structural Engineering Association of California (SEAOC) conference and was thrilled to have SP3 Senior Associate, D. Jared DeBock, PhD, PE represent our team by presenting one of our latest ground breaking projects: A practical design procedure for steel...

37

New Advancements to the SP3-RiskModel

The SP3 Team is pleased to announce advancements to the SP3-RiskModel.  SP3-RiskModel is the most reliable solution for rapid seismic risk assessment, and the only solution that can provide building-specific risk insights for component-level losses, reoccupancy and functional recovery times for business interruption....